For a project where the bagging silos were located 400 meters from the palletizing and storage hall, an inexpensive solution had to be found. The challenge was to plan the plant into existing structures. At the same time the operation should be fully automatic and 100% monitored.
The picture shows the elaborate construction from the silo system via pipe bridges to the storage/palletising hall.